Residents: Share Your Feedback on Proposed Grant Projects
Residents,
Please let us know what you think about these three proposed grant projects. Please send your comments to adisisto@royalpalmbeachfl.gov.
EN2102 Pedestrian Pathway Wayfinding
Project Description: Construct kiosks with maps of the bicycle/pedestrian network at major intersections, install guide signs and mile posts to delineate bike path routes, and construct shelter pavilions.
Anticipated Construction: FY 2026
EN2302 ADA Improvements Phase II
Project Description: Install and or modify curb ramps and sidewalk connections Village wide to meet current ADA standards. Replace existing deteriorated curb and gutter, grading, signing and striping, and any other incidental drainage improvements to the corridor.
Anticipated Construction: FY 2026
EN2305_FPL Pathway Pedestrian & Bike Improvements
Project Description: Replace the existing 8.0' wide asphalt pathway with a 10.0' wide concrete pathway from Bilbao St. to Okeechobee Blvd. Expand walkways on Okeechobee Blvd. and add a 10.0' wide concrete pathway adjacent to the Brass Ring parking lot. Replace the existing 4' sidewalk with 10' on the south side of Sparrow Dr. between Sweet Bay Ln and Crestwood Blvd. Add new sidewalk on Lamstein Ln. between Seminole Lakes Dr. and Cape Ivy Point. Reconfigure Sparrow Dr. cul-de-sac to include ADA crossing and connect Sparrow Dr. to the FPL Pathway. Reconfigure parking lot to protect FPL Pathway mid-block crossing from improper use of the sidewalk as an exit from the lot.
Anticipated Construction: FY 2028